                UARS WEEKLY STATUS REPORT - 20 Sep 2002

********************************************************************

***********
SOLSTICE
***********

During this week, SOLSTICE continued to operate in good health gathering 
solar data on all available orbital tracking periods.

***********
SUSIM
***********

SUSIM has successfully performed its daily mid-resolution and MgII
solar scans during this past week for periods of predicted UARS
telemetry.

***********
ACRIM
***********

The ACRIM Science Team held discussions with FOT representatives and 
obtained documentation pertaining to ACRIM2 power on/off sequences. A new 
program of attempting to stimulate power-on operation is being designed 
and will be implemented shortly.

***********
PEM
***********

Nothing received.

***********
HALOE 
***********

Nothing received.

***********
MLS
***********

Nothing received.

***********
HRDI
***********

Nothing received.

***********
WINDII
***********

Nothing received.

***********
MPG
***********

The MPG continues to serve as the point-of-contact for UARS
instrument operations to support re-engineering of the UARS
Mission Operations Concept to develop capabilities for the
Science Traceability Mission.

Daily processing of instrument Daily Activity Plans continues
with no problems.

***********
CDHF
***********

Nothing received.
                  
***********
FOT
***********

                           REPORTING PERIOD

This  report  covers  07 September 2002 (Orbit  60098,  GMT  Day  250)
through 13 September 2002 (Orbit 60203, GMT Day 256).

                         SPACECRAFT OPERATION

The observatory is now in Forward Flight (Southern Hemisphere viewing)
and   is  performing  nominally  under  two-battery  operations.   The
instrument operational changes were:

                    INSTRUMENT OPERATIONAL CHANGES

       Instrument    Time          Orbit     Comment
       HALOE         251/1225      60121     POWER ON
       PEM(Z/H)      252/1223      60136     POWER ON
       HRDI          253/0342      60145     TO DAY ONLY MODE
       HRDI          254/2156      60172     TO FULL TIME MODE

The  beta  angle  ranged between the angles of 11.5  degrees  to  34.6
degrees  for  this  report period.  The beta angle is  now  increasing
towards a maximum angle of 57 degrees on 23 September 2002 (DOY 266).

Spacecraft  battery  1,  2,  and 3 performance  monitoring  continues.
Battery 1 remains OFF the charge relay.  Battery 2 and Battery  3  are
currently maintaining greater than 23.6 V end-of-night (EON) load  bus
voltage.   Battery  temperatures are stable with a  temperature  delta
between Battery 2 and Battery 3 of 1.27 to 1.28 degrees C.  Additional
battery  performance  data for each battery on  06  September  and  13
September 2002 are provided in Appendix D.

The  clock  error  ranged from -10.0 to 10.7 msec during  this  report
period.  Clock rate adjustments are listed in Appendix C.

All  instrument  and subsystem engineers were advised on  the  initial
excursion  of ALERTS or Out-Of-Limits conditions detected by  the  FOT
for  this report.  A summary is listed below and the details of  ALERT
and Out-Of-Limits occurrences are listed in Appendix B.

    OUT-OF-LIMITS  =    00
    ALERTS         =    00

The  following real-time command sheets were executed for  the  listed
operational element(s) during this report period (see Appendix A).

    FOT       =    02
    PEM       =    01
    SUSIM     =    01
    HALOE     =    02
    HRDI      =    02


UARS Anomaly Reports initiated during this report period are listed in
Appendix E and summarized below.

    FOT  =    00

One  (1) Anomaly Report remained OPEN at the end of this report period
(see Appendix E).

                        GROUND SYSTEM OPERATION

Zero  (0) operational support problems occurred this period.   Anomaly
Reports are included in Appendix E.

The  data  loss  calculations are no longer  being  supplied  by  Data
Capture Facility (DCF).


                       OTHER SIGNIFICANT EVENTS


                       UARS SATELLITE OPERATIONS


The  UARS  FOT  is  preparing  for the integration  of  the  ERBS  FOT
beginning  on 16 September 2002.  ERBS hardware has begun  making  its
way  over  from  Building 14 and will continue to flow in  next  week.
ERBS  will  take  all  of  its day shift events  next  week  from  the
horseshoe  in  Building 32.  We hope that the ERBS team has  the  same
success  that we experienced in getting fully operational on  the  new
system.


The hard disk on the prototype will be repaired on 16 September 2002.
This will allow the FOT to test the patches that have been made by the
Eclipse development team.  Once the patches have been tested a new
delivery of the software will be installed.  This will most likely not
take place until the ERBS integration is complete.


                               MEETINGS


The FOT attended the UARS Monthly Status Meeting on 05 September 2002.


                       FUTURE SIGNIFICANT EVENTS


The  next  UARS Yaw slew is scheduled for 10 October 2002  (DOY  283).
This  maneuver will be a Forward to Reverse Flight maneuver  (Northern
Hemisphere viewing).
     


Attachments:     Appendix A,     Real-time Command Sheets
                 Appendix B,     Out-Of-Limits   &   ALERT  Occurrences
                 Appendix C,     Clock &  Solar  Array  Rate  Corrections
                 Appendix D,     UARS Battery Performance Data
                 Appendix E,     UARS Anomaly Reports


                              APPENDIX A
                       REAL-TIME COMMAND SHEETS
                     Week ending 13 September 2002

ORBIT   AOS        NO.      SUBSYS      REASON
-----   ---        ---      ------      ------
60105   250/1047   02-315   SUSIM       POWER ON COMPLETE
60121   251/1225   02-317   HALOE       POWER ON START
60126   251/2037   02-318   HALOE       POWER ON COMPLETE
60135   252/1043   02-319   OBC/CLK     CLK ADJ FR -20.6 TO 0.0 MSEC/DAY
60136   252/1223   02-320   PEM         POWER ON ZEPS/NEPS DAY-ONLY
60145   253/0342   02-321   HRDI        COMMANDED TO DAY ONLY OPS
60172   254/2156   02-322   HRDI        FROM DAY ONLY OPS TO FULLTIME
60188   255/2334   02-323   OBC/CLK     CLK ADJ FR 0.0 TO 20.6 MSEC/DAY
                                   
                                   
                                   
                              APPENDIX B
                  OUT-OF-LIMITS & ALERTS OCCURRENCES
                     Week ending 13 September 2002

The following Out-Of-Limits occurrences were detected:

MNEMONIC       STATE   DESCRIPTION                ORBITS
--------       -----   -----------                ------
-None this report period.


The following ALERT occurrences were detected:

MNEMONIC     DESCRIPTION                          ORBITS
--------     -----------                          ------
-None this report period.

                              APPENDIX C
                 CLOCK & SOLAR ARRAY RATE CORRECTIONS
                     Week ending 13 September 2002

                     CLOCK DRIFT RATE ADJUSTMENTS

ORBIT          TIME                   CLOCK RATE CHANGE
-----          -----                  -----------------
60135          252/1046               CLK ADJ FR -20.6 TO 0.0 MSEC/DAY
60188          255/2337               CLK ADJ FR 0.0 TO 20.6 MSEC/DAY
                               
                                                           
                              APPENDIX D
                     UARS BATTERY PERFORMANCE DATA
                     Week ending 13 September 2002


     06 September 2002 - GMT Day 249 Beta = 07.7 deg, SA Pos = 269 deg

     DIFF V (mV)  TEMP (C)     CURR (amp)  EON V    AVE C/D  AVE
BAT  MAX/MIN      MAX/MIN      MAX/MIN     MIN      RATIO    DOD(%)
---  -------      --------     ----------  -----    -------  ------
1  -134.4/-156.8 -3.68/-4.94  +00.0/+00.0  08.3      0.000    0.0
2   +11.2/-100.8 +4.51/+3.87  +28.4/-12.8  25.4      1.020   19.5
3   +22.4/-22.4  +3.87/+2.92  +27.2/-12.8  25.4      1.010   19.0


     13 September 2002 - GMT Day 256 Beta = 34.6 deg, SA Pos = 269 deg

     DIFF V (mV)  TEMP (C)     CURR (amp)  EON V    AVE C/D  AVE
BAT  MAX/MIN      MAX/MIN      MAX/MIN     MIN      RATIO    DOD(%)
---  -------      --------     ----------  -----    -------  ------
1  -140.0/-162.4 -3.05/-4.31  +00.0/+00.0  08.3      0.000    0.0
2   +11.2/-123.2 +5.79/+4.51  +27.6/-15.2  24.5      1.040   20.9
3   +22.4/-67.2  +5.15/+3.87  +27.2/-15.2  24.3      1.040   20.6


     V/T LEVEL CHANGES
ORB#           AOS TIME   LVL FR-TO
-----          --------   ---------
-None this report period.



                              APPENDIX E
                         UARS ANOMALY REPORTS
                     Week ending 13 September 2002


                     NEW ANOMALY REPORTS GENERATED
AR NO.    SUBSYS    ORBIT     TIME      CDS       PROBLEM/DATA LOSS
------    ------    -----     ----      ---       -----------------
-None this report period.

                 ANOMALY CLOSURE INFORMATION RECEIVED
AR NO.    SUBSYS    ORBIT     TIME      CDS       PROBLEM/DATA LOSS
------    ------    -----     ----      ---       -----------------
-None this report period.

                ANOMALY INVESTIGATION REPORTS GENERATED
AR NO.    SUBSYS    ORBIT     TIME      CDS       PROBLEM/DATA LOSS
------    ------    -----     ----      ---       -----------------
-None this report period.

                         OPEN ANOMALY REPORTS
AR NO.    SUBSYS    ORBIT     TIME      CDS       PROBLEM/DATA LOSS
------    ------    -----     ----      ---       -----------------
02-045    FOT       59717     224/1458  14170     Generic Late Acquisition