******************************************************************** UARS WEEKLY STATUS REPORT - 10 Jan 2003 ******************************************************************** *********** SOLSTICE *********** SOLSTICE continues to operate normally, taking solar data on all available orbital tracking periods. *********** SUSIM *********** SUSIM successfully gathered all of its daily 1.1 nm (mid) resolution and MgII solar scans this past week during periods of predicted UARS telemetry. *********** ACRIM *********** Nothing received. *********** PEM *********** The PEM web site has moved. It has a new URL. Access the PEM web site using http://wwwpem.space.swri.edu. The PEM data from the GUVI conjunction periods has moved to http://wwwpem.space.swri.edu/guvi-pem.html. It was discovered that this web site was not updated properly with the latest PEM data plots. SwRI has fixed this problem. Level 2 PEM HEPSA data files are being reprocessed for submission to the DAAC. This data has been designated as version 2; however, there is no format difference from the version 1 data format. Version 2 HEPSA data is being generated because it was discovered that there exists processing errors within some of the HEPSA version 1 data files. Thus, if you are using any HEPSA version 1 data files from the DAAC, please replace them with the version 2 data files. Currently, HEPSA data between 1991274 and 1994169 has been reprocessed. PEM HEPSA data from 1994160 through 1994169 is waiting for DAAC archive. PEM continues to work with the GUVI team on the diagnosis of data from the first conjunction period. Analysis of the two conjunction passes showed that the aurora as detected by GUVI was at higher latitude than UARS. GUVI images from other times from the first conjunction period show spatial regions that both GUVI and PEM sampled when aurora was present. Separation is several minutes to 10's of minutes when both instruments saw aurora. PEM has seen no aurora during the second conjunction period. Due to a spacecraft anomaly, no PEM data was collected during the third conjunction period. PEM continues to receive NMC data files from NOAA. No problems have been encountered. NOAA has changed the binary structure of the NMC data and PEM is now receiving two data streams, one in the original VAX format and the other from their new binary format. *Beginning of power orbit day (PEM activation): array current >5 amps, array voltage >53.5 volts, and battery current >2.0 amps. End of power orbit day (PEM deactivation): time in power orbit day >4 minutes, array current <9 amps, and battery currents <0.2 amps. Power orbit day variation: ~39-40 min at yaw to ~50-51 min at maximum beta. *********** HALOE *********** Nothing received. *********** MLS *********** Nothing received. *********** HRDI *********** Nothing received. *********** WINDII *********** Nothing received. *********** MPG *********** The MPG participated in the UARS/TOMS Monthly Status Review meeting held on January 7, 2003. The MPG continues to serve as the point-of-contact for UARS instrument operations in support of the Science Traceability Mission of UARS. Daily processing of instrument Daily Activity Plans continues with no problems. *********** CDHF *********** Nothing received. *********** FOT *********** REPORTING PERIOD This report covers 28 December 2002 (Orbit 61782, GMT Day 362) through 03 January 2003 (Orbit 61886, GMT Day 003). SPACECRAFT OPERATION The observatory is now in Reverse Flight (Northern Hemisphere viewing) and is performing nominally under two-battery operations. The instrument operational changes were: INSTRUMENT OPERATIONAL CHANGES Instrument Time Orbit Comment HALOE 364/0054 61812 POWER OFF The beta angle ranged between the angles of 39.7 degrees to 67.9 degrees for this report period. The beta angle is now increasing towards a maximum angle of 79 degrees on 08 January 2003 (DOY 008). Spacecraft battery 1, 2, and 3 performance monitoring continues. Battery 1 remains OFF the charge relay. Battery 2 and Battery 3 are currently maintaining greater than 23.6 V end-of-night (EON) load bus voltage. Battery temperatures are stable with a temperature delta between Battery 2 and Battery 3 of 1.26 to 1.27 degrees C. Additional battery performance data for each battery on 27 December and 03 January 2003 are provided in Appendix D. The clock error ranged from -10.6 to 10.0 msec during this report period. Clock rate adjustments are listed in Appendix C. All instrument and subsystem engineers were advised on the initial excursion of ALERTS or Out-Of-Limits conditions detected by the FOT for this report. A summary is listed below and the details of ALERT and Out-Of-Limits occurrences are listed in Appendix B. OUT-OF-LIMITS = 00 ALERTS = 00 The following real-time command sheets were executed for the listed operational element(s) during this report period (see Appendix A). FOT = 02 HALOE = 01 UARS Anomaly Reports initiated during this report period are listed in Appendix E and summarized below. FOT = 02 Three (3) Anomaly Reports remained OPEN at the end of this report period (see Appendix E). GROUND SYSTEM OPERATION Two (2) operational support problems occurred this period. Anomaly Reports are included in Appendix E. The data loss calculations are no longer being supplied by Data Capture Facility (DCF). OTHER SIGNIFICANT EVENTS UARS SATELLITE OPERATIONS There were no year end rollover issues with either the ground system or spacecraft, so all systems remained nominal during the transition to the new year. The FOT is working with HRDI to fix a problem found in their DAP regarding PSU commands. This issue should be resolved very soon. The FOT also made some changes to the HALOE turn on procedure to give the operator more flexibility should a problem arise during the instrument activation. Those corrections should be under configuration management prior to the next HALOE turn on. MEETINGS -None this report period. FUTURE SIGNIFICANT EVENTS The next UARS Yaw slew is scheduled for 27 January 2003 (DOY 027). This maneuver will be a Reverse to Forward Flight maneuver (Southern Hemisphere viewing). Attachments: Appendix A, Real-time Command Sheets Appendix B, Out-Of-Limits & ALERT Occurrences Appendix C, Clock & Solar Array Rate Corrections Appendix D, UARS Battery Performance Data Appendix E, UARS Anomaly Reports APPENDIX A REAL-TIME COMMAND SHEETS Week ending 03 January 2003 ORBIT AOS NO. SUBSYS REASON ----- --- --- ------ ------ 61800 363/0536 02-506 OBC/CLK CLK ADJ FR 20.6 TO 0.0 MSEC/DAY 61812 364/0054 02-507 HALOE POWER OFF 61839 365/1957 02-508 OBC/CLK CLK ADJ FR 0.0 TO 20.6 MSEC/DAY APPENDIX B OUT-OF-LIMITS & ALERTS OCCURRENCES Week ending 03 January 2003 The following Out-Of-Limits occurrences were detected: MNEMONIC STATE DESCRIPTION ORBITS -------- ----- ----------- ------ -None this report period. The following ALERT occurrences were detected: MNEMONIC DESCRIPTION ORBITS -------- ----------- ------ -None this report period. APPENDIX C CLOCK & SOLAR ARRAY RATE CORRECTIONS Week ending 03 January 2003 CLOCK DRIFT RATE ADJUSTMENTS ORBIT TIME CLOCK RATE CHANGE ----- ----- ----------------- 61800 363/0538 CLK ADJ FR 20.6 TO 0.0 MSEC/DAY 61839 365/1959 CLK ADJ FR 0.0 TO 20.6 MSEC/DAY APPENDIX D UARS BATTERY PERFORMANCE DATA Week ending 03 January 2003 27 December 2002 - GMT Day 361 Beta = 38.4 deg, SA Pos = 269 deg DIFF V (mV) TEMP (C) CURR (amp) EON V AVE C/D AVE BAT MAX/MIN MAX/MIN MAX/MIN MIN RATIO DOD(%) --- ------- -------- ---------- ----- ------- ------ 1 -156.8/-179.2 -3.68/-4.31 +00.0/+00.0 08.3 0.000 0.0 2 +16.8/-72.8 +5.46/+4.50 +28.0/-15.6 25.1 1.010 21.5 3 +22.4/-44.8 +4.50/+3.87 +27.2/-15.6 25.1 1.010 21.0 03 January 2003 - GMT Day 003 Beta = 67.9 deg, SA Pos = 269 deg DIFF V (mV) TEMP (C) CURR (amp) EON V AVE C/D AVE BAT MAX/MIN MAX/MIN MAX/MIN MIN RATIO DOD(%) --- ------- -------- ---------- ----- ------- ------ 1 -156.8/-179.2 -3.05/-4.63 +00.0/+00.0 08.3 0.000 0.0 2 +11.2/-22.4 +3.87/+2.60 +20.4/-15.2 26.4 1.040 16.9 3 +16.8/-22.4 +2.91/+1.65 +19.6/-15.2 26.4 1.040 16.7 V/T LEVEL CHANGES ORB# AOS TIME LVL FR-TO ----- -------- --------- -None this report period. APPENDIX E UARS ANOMALY REPORTS Week ending 03 January 2003 NEW ANOMALY REPORTS GENERATED AR NO. SUBSYS ORBIT TIME CDS PROBLEM/DATA LOSS ------ ------ ----- ---- --- ----------------- 02-059 FOT 61797 363/0021 30832 Generic Late Acquisition 03-001 FOT 61868 002/1904 30832 Generic Late Acquisition ANOMALY CLOSURE INFORMATION RECEIVED AR NO. SUBSYS ORBIT TIME CDS PROBLEM/DATA LOSS ------ ------ ----- ---- --- ----------------- 02-059 FOT 61797 363/0021 30832 Generic Late Acquisition ANOMALY INVESTIGATION REPORTS GENERATED AIR NO. SUBSYS ORBIT TIME CDS PROBLEM/DATA LOSS ------ ------ ----- ---- --- ----------------- -None this report period. OPEN ANOMALY REPORTS AR NO. SUBSYS ORBIT TIME CDS PROBLEM/DATA LOSS ------ ------ ----- ---- --- ----------------- 02-058 FOT 61113 317/1341 N/A NEG ACQ / UFLTR ERROR 02-060 FOT 61421 338/0057 N/A PSU Cmd Clock Timeout 03-001 FOT 61868 002/1904 30832 Generic Late Acquisition